Power of Scalable Storage: True ROI of Fuel Storage for Megasites
The rise of the “megasite” has proven to be a major boost for general contractors who secure the projects, but these sites come with complex logistics and high costs to manage. Like on any job, contractors must ensure that they have the right equipment at the right time, coordinate workers and numerous subcontractors, and procure and store materials — but on a significantly larger scale than the average project.
With all of this to think about, fuel for the jobsite is often an afterthought. But without a reliable fuel source, you’ll be faced with a contractor’s worst nightmares: downtime and delays.
Keeping your jobsite moving with fuel doesn’t have to be complicated. Choosing the right partners and solution can simplify at least one part of managing a megasite.
Megasite Fueling Challenges
Developing a fuel plan for your jobsite at the outset is critical, and megasites pose some unique fueling challenges:
Access: How will you get fuel to the equipment?
- In the dirt phase — when fuel use is at its highest — large excavation equipment is difficult to move. Later on in the project, equipment might be inside buildings.
- Thinking through every phase of the build and ensuring fuel access throughout will keep the jobsite humming.
Deliveries: On-time fuel delivery is vital to a megasite.
- On average, 15,000 gallons of diesel are used on a large jobsite every week, which means daily visits from your fuel supplier if you’re wet hosing. And if those deliveries are delayed, you risk running out of diesel and your jobsite grinding to a halt.
Traffic: On a large jobsite with hundreds of pieces of equipment and thousands of workers, traffic is a major concern.
- High site traffic increases safety risks, emissions and work slowdowns. Limiting the number and frequency of trucks coming on-site to wet hose can make a significant difference in traffic.
The best way to address these challenges and optimize jobsite fueling logistics: on-site bulk fuel storage
Fuel Tank Solutions for Megasites
While every project is unique, we’ve seen this general setup work well on massive jobsites:
- Fuel island: Utilize a large tank as a fuel island. These tanks can hold between 2,000 and 19,000 gallons and serve as the central repository of fuel for the jobsite. They are typically stationary and don’t move over the course of the job. This setup also creates a single spot for fuel distributors or rental houses to refill on the site, significantly reducing traffic.
- Fuel tanks: Place smaller fuel tanks — with capacities ranging from 500 to 2,000 gallons — throughout the site for easier refueling access. Having several tanks at strategic spots near where work is happening makes it easier for operators to refill equipment without driving hundreds or thousands of yards to do so. They can be easily moved as the work moves with four-way forklift pockets.
- Fuel trailers: Use mobile fuel trailers to take fuel from the fuel island and top off the smaller tanks scattered throughout the site. Our Transcube Mobile Refueler is built for rugged jobsites.
- DEF tanks: Any Tier IV engine running on diesel will also need diesel exhaust fluid (DEF). The most efficient and cost-effective solution is to also order DEF in bulk and store it in high-quality tanks — like the DEFCube — alongside your fuel tanks for easy access.
- Fuel management systems: Equipping your tanks with fuel management systems allows you to track fuel usage by equipment and subcontractor. This provides a wealth of data for you that can extrapolate emission metrics, as well as enabling you to charge subcontractors for their exact share of the fuel.
The Real Savings of Jobsite Fuel Storage
The cost savings that can be realized with bulk fuel storage on a megasite are substantial. The most direct cost saving is bulk fuel discounts. Distributors often provide a discount ranging from $0.30 to $1 per gallon to contractors buying in bulk, which adds up quickly with the amount of fuel consumed on a megasite weekly. You’ll also save on fuel delivery fees with less frequent fuel drops.
Callout: You could be saving at least $4,500 every week by purchasing bulk fuel (based on 15,000 gallons a week with a $.30 discount per gallon)
And on-site storage can reduce downtime on the jobsite because you have access when you need it — no waiting for deliveries. Equipment downtime means wasted dollars: For example, if an excavator costs $125 an hour to rent and you pay the operator $39 per hour, you’re looking at a cost of $164 for every hour wasted on downtime.
Beyond these direct costs, downtime results in several cascading consequences that drive up costs, including overtime for crews to catch up (at least 1.5 times their hourly rate) and costly delay claims.
Additionally, it’s important to note that not all fuel storage solutions are created equal. Traditional round tanks, while potentially cheaper from an upfront cost or rental rate perspective, come with hidden additional expenses. One of the most significant is the required containment berm and maintenance of that berm, which can cost hundreds per month — an expense that modular fuel tanks like those made by Western Global don’t come with.
Double-walled tanks reduce the risk of spills and ground contamination — and a fine from the EPA that can vary by state and spill severity. One study found the average EPA state fine to come in around $35,000, while the average federal penalty was $186,000.
Just Add Fuel
Don’t make fuel for your jobsite an afterthought: When working with your rental partner or fuel distributor, make sure they have a stock of Western Global tanks ready to provide the best turnkey, on-site fuel storage and dispensing solution for your megasite project.