TransCube Offshore Goes Into Operation in the North Sea

TransCube Offshore Goes Into Operation in the North Sea

The installation of 97 offshore wind turbines in the North Sea.
offshore_tcg_goes_into_the_north_sea_promo

CHALLENGE

The customer was in need of a solution that would be fully compliant in design to international off-shore regulations and provide a safe, long-lasting performance in the most extreme environment. They also required the design of a remote level monitoring device which would interface with their electronic management system and provide reliable readings over prolonged exposure in very challenging conditions. In addition, the time-scale of the project was very tight, working towards the customer’s program and vessel sailing times.

SOLUTION

Western Global used their experience and engineering capabilities to create a solution that would meet all of the customer’s criteria. The newly developed TransCube Offshore 20TCG-OS storage tank was combined with our innovative C2020-A remote level monitoring system to meet their needs. These products were designed for use within the highly regulated Offshore Oil & Gas industry, meeting EN12079 and UN IBC approvals.

RESULTS

The solution provided fully met the customer’s requirements. The customer benefited from reduced timescales, increased operational efficiencies and a cost effective reliable solution that stayed within the budgetary restraints. Furthermore, Western was able to improve on desired schedules by utilizing their global expertise and operations to fast-tracking production programs. This ultimately allowed Western to deliver the product ahead of schedule and support the success of the customer’s project.

MUDBOX OFFSHORE

Mud/cutting tank for handling drilling waste.